600 MW of AI compute the grid can schedule.

Project Ohm builds modular compute nodes and the platform that orchestrates them. It runs our nodes and our partners' as one fleet and is designed to take on third-party compute as well. To the grid, all of it is demand that rises with the midday surplus and steps back at the peak.

600 MW: Project Ohm rollout plan, September 2026

00.2The opportunity

AI load is coming either way. Ours moves with the grid.

The government proposes that large data centres reduce power when the grid needs it. It has been our design from day one.

Prime Minister, AI in Australia's interests, 15 July 2026 (opens in a new tab)

00.3The node

Modular compute at the substation.

Our nodes are modular compute units of 1 to 20 MW, built with tier-1 hardware partners. They sit at or near distribution substations and utility sites, and at renewable generation sites.

1 to 20 MW: Project Ohm rollout plan, September 2026

  1. 01Grid connection

    Connects the node to the substation's switchyard. A small battery, not a diesel or gas generator, gives running jobs time to save their progress if the power drops.

  2. 02Metering and telemetry

    Measures the node's power and streams live operating data to the orchestration platform.

  3. 03Compute array

    High-density accelerator racks from any vendor, for AI training, fine-tuning, and batch and live inference.

  4. 04Cooling

    Air or closed-loop liquid cooling that carries the heat away from the racks, designed to avoid the ongoing water use of evaporative cooling.

00.4The platform

Multi-variable scheduling for dynamic electricity grids.

Our nodes run flexible and time-critical AI work alike. Flexible jobs, such as training, fine-tuning, batch inference, embeddings, synthetic data, simulation and rendering, follow the cheapest and most abundant power. Time-critical work, such as live inference, runs on the node closest to its users. The orchestration platform decides when and where each job runs, and it is hardware-agnostic by design, so each job can run on the accelerator that suits it best. It weighs four things:

And from them, it decides:

  • Where workloads run.
  • When they run.
  • How capacity responds.

00.5On the grid

Connected like a load. Dispatched like a resource.

Every node sits behind the meter. The orchestration platform decides when each one runs and how hard, following the electricity market as it moves: live data, network constraint forecasts and regional supply. So the whole fleet acts as one resource the grid can schedule: a Dispatchable Compute Resource.

  • Spot price, $/MWh
  • Compute, simulated
AEMO aggregated price and demand data (opens in a new tab), South Australia, 10 September 2026, AEST · compute: simulation

Plugs into today's markets.

A Dispatchable Compute Resource is a new category, built to fit the mechanisms networks and markets already use.

In WA

Network support services, the Demand Side Programme, essential system services and Scheduled Facility registration.

In the NEM

Wholesale demand response, frequency control ancillary services (FCAS) and voluntary scheduling.

We tested the scheduler in simulation against 21 days of real five-minute AEMO prices.

00.6In the community

Built to work with communities, not against them.

Project Ohm is designed to earn social licence through existing infrastructure locations, low-water cooling and measured contributions to the electricity transition, not by asking communities to accommodate a new generation of data-centre campuses.

  1. Using land that's already there.

    We locate our nodes at or near existing substations and utility sites, reducing the need for large new developments. They connect to the network that is already there, with no new high-voltage lines.

  2. Making better use of renewable energy.

    Our nodes increase activity when renewable energy is plentiful and reduce demand when the network is under pressure, so households come first at the evening peak.

  3. Using less water.

    We use air cooling or closed-loop liquid cooling, designed to avoid the large ongoing water use of evaporative cooling.

  4. No diesel or gas backup.

    Because the work can move, our nodes are designed without diesel or gas generators. A small battery gives running jobs time to save their progress instead.

  5. Smaller, modular nodes.

    Our nodes take up less space and have less visual impact. They can grow as needed, and can be relocated if circumstances change.

  6. Exploring new technology.

    We work with technology partners to explore thermal batteries, heat recovery and advanced cooling that cut energy waste.

  7. Investment in hundreds of towns.

    Our Australian roadmap targets 300 to 400 substations, so the investment reaches hundreds of communities, not one campus.

    300 to 400 substations: Project Ohm rollout plan, September 2026

00.7Carbon receipts

Time-matched carbon accounting.

Enterprise AI demands verifiable environmental reporting. Every node meters its own power, and the platform knows where and when each job ran, so we are building carbon receipts, a time-stamped record of each job: where and when it ran, and the emissions of the power it drew at that hour.

Carbon receipt

  • Job
  • Where
  • When
  • Emissions of that hour's power

00.8The rollout

From one substation to hundreds.

It starts with Node 01, in a substation in Geraldton, WA, with Western Power, and a second site is in planning on the east-coast market. From there the fleet grows across Australia's two main grids, the SWIS and the NEM, to 300 to 400 substations, each node sized to the capacity on site and installed on a nine-month target deployment cycle, using network capacity that already exists, with XENON supplying the hardware.

At full scale, that's a power station's worth of demand the grid can turn up and down.

Built to move.

When a substation no longer needs the extra load, its node goes on a truck to one that does. A fixed data centre stays where it was built; this fleet goes where the grid needs it.

Grows faster than we can build.

The fleet grows two ways: nodes Project Ohm funds itself, and nodes funded with partners, from utilities and energy partners to infrastructure investors. Beyond the fleet, the orchestration platform is designed to take on third-party compute and schedule it the same way: 600 MW in the fleet, and ultimately gigawatts under orchestration.

600MWtarget fleet

300+substations

1MW+at each site

announced deployment siteplanned fleet, placed for the drawing
  1. Now Node 01, in Geraldton
  2. Next the east-coast market
  3. Then 300 to 400 substations across the SWIS and the NEM
  4. After that Southeast Asia, then beyond

600 MW across 300 to 400 substations, each from about 1 MW: Project Ohm rollout plan, September 2026

Be on the map.

Substations with spare capacity at midday, and wind and solar farms that are curtailed, are where the fleet goes next. We're choosing the first sites now.

Propose a site

00.9Next steps

  1. Put flexible demand on the grid.

    Network and market operators, regulators and policy teams: talk to our engineers about what schedulable compute can do for the grid, and where it fits.

    Request a technical briefing
  2. Run workloads on grid-aware infrastructure.

    Live inference close to your users, or training, fine-tuning and batch work that follows the cheapest power: tell us about your workload and we will tell you how it fits.

    Discuss a workload