For investors
AI needs power. We bring compute to it.
Project Ohm is the orchestration engine for distributed AI infrastructure: modular compute nodes deploy at substations and other power-rich locations, operated as one network by our proprietary orchestration platform. We're targeting 600 MW across Australia, then Southeast Asia and beyond.
Nothing on this site is an offer, invitation or recommendation to buy or sell securities, or financial product advice. Information about investing in Project Ohm is made available on request only to investors who qualify as wholesale, professional or sophisticated investors under Australian law.
Request the investor briefing600 MW
targeted across 300 to 400 Australian substation sites
Project Ohm rollout plan, September 2026
9 months
the target deployment cycle for a node
Project Ohm rollout plan, September 2026
1 to 20 MW
a modular node architecture sized to available site capacity
Project Ohm rollout plan, September 2026
00.2Why now
AI is scaling faster than the power beneath it.
About 950 TWh
Projected global data-centre electricity demand by 2030, roughly double 2025's. The bottleneck has moved from chips to power, grid connections and time.
IEA, Key Questions on Energy and AI, April 2026 (opens in a new tab)
- AI demand
- Queued
- Available capacity
AI demand
Illustrative
Power
Grid
Time
91.7%
of about 37.7 GW of data-centre capacity under construction across the Americas is already precommitted.
Cushman & Wakefield, Americas Data Center Update, H1 2026 (opens in a new tab)
- AI demand
- Project Ohm capacity
- Conventional hyperscale capacity
- Time-to-capacity gap
Capacity
Illustrative
AI demand is not the constraint. Power and infrastructure delivery are.
Communities are asking more of what gets built, too: national standards for data-centre energy, water and land use are due in early 2027.
The opportunity sits between when compute is needed and when conventional infrastructure can deliver it, and we fill it a node at a time.
00.3The model
Instead of bringing gigawatts to compute, bring compute to available power.
A hyperscale AI factory needs gigawatts in one place, years of development and about US$60 billion per gigawatt. Our nodes are 1 to 20 MW each, go in on a nine-month target cycle and add capacity a step at a time, at existing substations rather than on large new sites, run by software as one network.
NVIDIA, earnings call, 26 August 2026 (opens in a new tab)Project Ohm rollout plan, September 2026
Traditional model
Concentrated
Hyperscale AI factory
- Gigawatt-scale developments
- About US$60 billion per gigawatt
- Multi-year development
- A large, concentrated grid requirement
Grid connection · Year 1 Year 2 Year 3+
Project Ohm model
Distributed and orchestrated
Distributed AI infrastructure
- 1 to 20 MW modular nodes
- Nine-month target deployment cycle
- Capacity added a step at a time
- Many power locations
- Run by software as one network
Orchestration layer
Project Ohm does not need to wait for an entire gigawatt-scale power solution before productive compute can begin operating.
- 1 MW
- 10 MW
- 100 MW
- 600 MW target
00.4The moat
Every node increases the value of the network.
The infrastructure is distributed; the intelligence is centralised. The orchestration layer decides where work runs, when it runs and how capacity responds. Every node gives the orchestration platform more power sources, locations, operating data and workload choices. As the network grows, the optimisation problem becomes richer and harder to replicate.
Five sources of defensibility
- Software Energy-aware, hardware-agnostic orchestration and workload control.
- Data Operating data across compute, energy and grid conditions.
- Network More locations create more scheduling options.
- Utility access Relationships, connection experience and repeatable deployment pathways.
- Commercial network Growing relationships with compute buyers and capacity partners.
More nodes
More power diversity
More scheduling choices
Higher network utilisation
More customers and workloads
More operating data
Better orchestration
Easier replication
00.5The market
Australia first. Then the region, and the world.
Australia is the launch market and the reference implementation: high renewable penetration, congested grids, curtailed power and sophisticated electricity markets. The same structural problem is forming across Southeast Asia and, at hyperscale, in the United States.
- Power constraint
- AI demand
- Grid congestion
- Capacity urgency
Australia
Prove the architecture.
APAC and Southeast Asia
Scale into rapidly growing regional infrastructure markets.
United States and beyond
Apply the platform to the world's largest AI infrastructure build-out.
Different markets. Same structural problem. Same orchestration architecture.
Australia
9.0 GW
of large data centres in the NEM's transmission connection process, June 2026.
AEMO, Quarterly Energy Dynamics Q2 2026, p. 43 (opens in a new tab)
Southeast Asia
About 50%
of the data-centre capacity under construction in APAC is in Southeast Asia.
Cushman & Wakefield, APAC data centre pipeline, H1 2026 (opens in a new tab)
United States
11.8%
of US electricity could go to data centres by 2030, in the reference case.
Lawrence Berkeley National Laboratory, 2025 Update (opens in a new tab)
00.6How it scales
Scale the network faster than the balance sheet.
The network can grow through Project Ohm-owned nodes, infrastructure partnerships and third-party compute connected to the orchestration platform. Our Australian target is 600 MW in the fleet, with a long-term opportunity to orchestrate capacity at gigawatt scale.
Project Ohm rollout plan, September 2026
In the fleet
Own
Nodes Project Ohm funds and controls.
In the fleet
Partner
Nodes funded through joint ventures, infrastructure investors, utilities, energy partners or equipment finance.
Designed for, coming
Orchestrate
Third-party compute capacity, on any vendor's hardware, connected to the Project Ohm platform and run as part of the same network.
The ecosystem is already forming.
Site
Western Power, whose network hosts the proposed Node 01 site.
Power
Energy-market and demand-response partners under development in the WEM and NEM.
Infrastructure
XENON Systems, investor and strategic infrastructure delivery partner, on the cloud-native Kubernetes ecosystem and accelerators from any vendor, starting with NVIDIA.
Workload
The Pawsey Supercomputing Research Centre, the University of Western Australia as our research validation partner, and other research collaborators, then Visagio Australia and other compute customers in development.
Revenue
Compute customers and offtake, in development.